A school data platform rebuilt with nothing lost
A previous vendor had missed the delivery date and the deadline with schools was contractual. Our dedicated team rebuilt the platform in modules, with a separate group on the migration alone.
We quote fixed price for defined work and carry the overrun ourselves. We turn it down when requirements are still moving, because the alternative is an argument about change requests by week six.
Four greens and no red is roughly the test. A quote takes about a week of scoping, and you keep the scope document either way.
With two of the four, we quote the scoping work and hold the build quote back.
The scope written down, exclusions included, with acceptance criteria agreed.
One number, payment tied to milestones you can see.
Written variations with a price and a schedule impact, agreed before the work.
Defects against the agreed scope fixed at no charge.
A common pattern: discovery on time and materials, then a fixed price once the scope stops moving.
Each has a definable end. Work that ends when somebody is satisfied does not belong here.
Catalogue, checkout and analytics, live in 6 to 12 weeks.
See the sectorA migration with an agreed field mapping, where row counts settle acceptance.
See the sectorAn ERP customisation against a written scope.
See the sectorA certificate or report in a format someone else sets.
See the sectorThe stack follows the scope, and we name it in the quote.

A previous vendor had missed the delivery date and the deadline with schools was contractual. Our dedicated team rebuilt the platform in modules, with a separate group on the migration alone.
Three fields. An engineer reads it, and you get an answer within one working day.
The models differ in how much of the management you hand over. Code ownership is the same in all five, and changing model later is normal.
Engineers join your team and your process.
A team only on your product, led by us.
Your long-term site in Vietnam, run by us.
One price for a settled scope.
A centre that moves to your own entity.
Because we price the risk of being wrong about the estimate. On settled work that premium is small, and on unsettled work it is large, which is a sign to use another model.
Yes, as a small fixed engagement. You keep the scope document and can take it elsewhere.
Changes are quoted separately. If they become frequent, we suggest moving to a dedicated team.
We absorb it. That is the deal, and it is why we are careful about which work we accept on this basis.
Even a rough one. Within a call we will tell you whether a fixed price is honest for this work, or which model would serve you better.