Examination scheduling
Driven by the written scheme, so nobody maintains the calendar by hand.
Written schemes of examination, permits to work, and torque and pressure records that an assessor can follow. Here the paperwork is the condition of running.
For a qualifying pressure system the written scheme of examination decides what is examined, what damage is expected, by what method and at what maximum interval. Software that cannot carry those four things is a notes app.
A competent person has to be independent of operations and able to stop equipment being used. That is a role in the permission model.
Bolted joints are tightened to a figure. Where a tool can supply that figure, it should.
Driven by the written scheme, so nobody maintains the calendar by hand.
Issued, time-boxed, closed, with the trail attached to the equipment and the person.
Readings taken from the tool over Bluetooth and stored against the equipment.
Generated from what was captured, with the method and the interval shown.
Including the role that can stop equipment being used, separated from the operating line.
The result belongs in the CMMS.
These four are not guidance, they are the structure of the record.

Different sector, adjacent skill: torque. A maker of portable testers arrived with an application nobody had documented. We rebuilt the environments, then shipped a free and a paid version with digital torque reading through the KTC SDK.
Where a missed examination stops production.
Firms carrying out the examinations, where the report is the product.
Makers of torque and pressure instruments who want the app shipped with the tool.
Teams working to the client scheme, on the client site.
Related reading: digital gauge inspection, digital quality inspection and inspection management software.
It has to. Parts, damage mechanism, method and maximum interval are the four fields everything else hangs off.
Often, over Bluetooth or the maker SDK. Send us the model numbers and we will tell you which ones we can read.
As an authority in the permission model, separate from the operating line, including the ability to take equipment out of use.
You do, from the first commit. Repositories and cloud accounts stay in your name.
Thirty minutes with the engineers on how your examinations are scheduled now and what the report has to show.